Final | 4/5/2018 | 4/6/2018 | 4/6/2018 | A | PASS |
Daryl Spivey
|
|
|
PAT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Final | 3/30/2018 | 4/2/2018 | 4/2/2018 | A | PART |
Eric Strole
|
|
|
PAT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Need to install ice maker. Need air-gaps on all indirect drains and need to provide adequate drainage for 1 1/4 rp or instal a dbca. Temp final ok.
|
Plumbing Rough-in | 3/13/2018 | 3/13/2018 | 3/13/2018 | A | FAIL |
Eric Strole
|
|
|
Building is an open plenum. Cannot have any combustables in an open plenum.
|
Plumbing Rough-in | 2/8/2018 | 2/9/2018 | 2/9/2018 | P | PASS |
Eric Strole
|
|
|
PAT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Groundwork | 12/29/2017 | 1/2/2018 | 1/2/2018 | P | PASS |
Eric Strole
|
|
|
PAT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|