Final | 4/24/2018 | 4/24/2018 | 4/24/2018 | P | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
Plumbing Rough-in | 1/11/2018 | 1/12/2018 | 1/12/2018 | P | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
Plumbing Rough-in | 1/10/2018 | 1/10/2018 | 1/10/2018 | P | CANC |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
Plumbing Rough-in | 1/8/2018 | 1/9/2018 | 1/9/2018 | P | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen. Paint all exposed ABS pipe and fittings with latex paint. Insatll all cleanouts per ISPC 707.9
|