Final | 2/20/2018 | 2/21/2018 | 2/20/2018 | A | CANC |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Jason Brashears
|
Final | 2/20/2018 | 2/20/2018 | 2/20/2018 | P | PASS |
Dan Ediger
|
|
|
|
DOC - Permit Finaled | 2/20/2018 | 2/20/2018 | 2/20/2018 | P | PASS |
Dan Ediger
|
|
|
|
Final | 2/18/2018 | 2/20/2018 | 2/20/2018 | A | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Jason Brashears Install a rp backflow prevention assembly at the pitcher washer due to a low water inlet. Provide air gaps of 2x the pipe diameter on all indirect waste lines that don't already have an airgap.
|
Plumbing Rough-in | 12/27/2017 | 12/28/2017 | 12/27/2017 | A | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Jason Brashears
|