Final | 5/15/2018 | 5/16/2018 | 5/16/2018 | P | PASS |
Dan Ediger
|
|
|
RUSSELL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Final | 5/14/2018 | 5/15/2018 | 5/15/2018 | A | FAIL |
Dan Ediger
|
|
|
JEREMY IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. 1. Install a running trap on the indirect waste to the warming trays. 2. Seal all fixtures to the wall. 3. Label all backflow assemblies. 4. The condensate drain on the water heater cannot drain outside; drain to an approved receptor.
|
Plumbing Rough-in | 4/5/2018 | 4/6/2018 | 4/6/2018 | A | PASS |
Dan Ediger
|
|
|
DAVIS IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Groundwork | 3/15/2018 | 3/16/2018 | 3/16/2018 | A | PASS |
Bill VanDegrift
|
|
|
MIKE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER gw ok per resubmitted plans, grade floorsink vent along east wall at backfill and wrap all piping through floor.
|
Groundwork | 2/28/2018 | 3/1/2018 | 3/1/2018 | A | FAIL |
Dan Ediger
|
|
|
HENRY IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. Seperate the grease waste per plans. Verify the main drain isn't installed on the grease trap inlet.
|