Final | 1/23/2019 | 1/24/2019 | 1/24/2019 | P | PASS |
Matt Wrobel
|
|
|
Charlien Phone #: ###-####
|
PLM-Aging Inspection | 12/6/2018 | 12/6/2018 | 12/7/2018 | | PART |
Matt Wrobel
|
|
|
called and talked to them to get inspection scheduled
|
Plumbing Rough-in | 9/6/2018 | 9/6/2018 | 9/6/2018 | P | PASS |
Bill VanDegrift
|
|
|
Charlene Phone #: ###-#### basement rough in ok
|
Plumbing Rough-in | 1/22/2018 | 1/30/2018 | 1/30/2018 | P | PASS |
Dan Ediger
|
|
|
Charlene Phone #: ###-####
|
Other | 1/22/2018 | 1/23/2018 | 1/23/2018 | P | PEND |
Bill VanDegrift
|
|
|
call for access- Conference- Charlene Phone #: ###-#### just a conference see notes on ri.
|
Plumbing Rough-in | 1/19/2018 | 1/23/2018 | 1/23/2018 | P | PEND |
Bill VanDegrift
|
|
|
Charlene Phone #: ###-#### ri conference ok, will increase water to 3/4" to the last two fixtures, combo picking up kitchen sink ok.
|