Water and/or Sewer | 2/2/2018 | 2/5/2018 | 2/5/2018 | A | PASS |
Eric Strole
|
|
|
Hook up of sewer and water Phone #: ###-#### Inspection requested via web by Kirk Johns
|
DOC - Permit Finaled | 2/5/2018 | 2/5/2018 | 2/5/2018 | P | PASS |
Eric Strole
|
|
|
|
Water and/or Sewer | 1/23/2018 | 1/24/2018 | 1/24/2018 | A | FAIL |
Dan Ediger
|
|
|
hook up of water and sewer to mobile home unit Phone #: ###-#### Inspection requested via web by Kirk Johns. 1. Use a shielded band to make the transition to the sewer. 2. Test the dwv in the crawl up to the floor level
|