Final | 2/15/2018 | 2/20/2018 | 2/20/2018 | A | PASS |
Daryl Spivey
|
|
|
Thank you. Phone #: ###-#### Inspection requested via web by Bill Campbell added PVB.......ds
|
Plumbing Rough-in | 1/30/2018 | 1/30/2018 | 1/30/2018 | P | PART |
Daryl Spivey
|
|
|
Requesting a rough inspection approval to backfill excavation. The final inspection in another day or two. Thank you. Phone #: ###-#### Inspection requested via web by Bill Campbell ok for cover.... need to replace existing backflow assembly with an approved backflow assembly that is testable.........ds
|