Final | 8/16/2018 | 8/16/2018 | 8/16/2018 | P | PASS |
Bill VanDegrift
|
|
|
AB IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER final ok
|
Final | 8/15/2018 | 8/15/2018 | 8/15/2018 | P | PART |
Bill VanDegrift
|
|
|
AB IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER needs a pvb on the eyewash supply, temp occ ok.
|
Final | 8/9/2018 | 8/10/2018 | 8/10/2018 | P | NH |
Bill VanDegrift
|
|
|
MEL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER no access, recall when ready.
|
Final | 8/10/2018 | 8/10/2018 | 8/10/2018 | A | NR |
Bill VanDegrift
|
|
|
MEL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER 1) PVB on eyewash 2) calk kitchen sinks 3) extend toe kick around floor sink and open up the front 4) pipe soda rp drain 5) set soda equipment
|
Final | 8/8/2018 | 8/9/2018 | 8/9/2018 | P | CANC |
Bill VanDegrift
|
|
|
MEL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER plumber called and cancelled
|
Final | 7/26/2018 | 7/27/2018 | 7/27/2018 | P | CANC |
Dan Ediger
|
|
|
CHRIS IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER nr
|
Other | 7/24/2018 | 7/24/2018 | 7/24/2018 | P | PEND |
Bill VanDegrift
|
|
|
dishwasher needs an rp
|
Plumbing Rough-in | 4/18/2018 | 4/18/2018 | 4/18/2018 | P | PASS |
Dan Ediger
|
|
|
MEL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Plumbing Rough-in | 4/16/2018 | 4/17/2018 | 4/17/2018 | A | PASS |
Dan Ediger
|
|
|
MEL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. Plumbing ok excludes roof drains until under test. Piping ok
|
Plumbing Rough-in | 4/13/2018 | 4/16/2018 | 4/16/2018 | A | CANC |
Dan Ediger
|
|
|
MEL IS THE JOB CONTACT ###-#### Phone #: ###-#### >> Inspection requested via web by BECCA DUMMER Inspection cancelled from web by: BECCA DUMMER
|
Groundwork | 2/12/2018 | 2/12/2018 | 2/12/2018 | P | PART |
Dan Ediger
|
|
|
MEL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. The tank needs to be filled with water and call in for a 24hr leak test.
|
Groundwork | 1/26/2018 | 1/26/2018 | 1/26/2018 | P | PASS |
Dan Ediger
|
|
|
JOHNNY IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Groundwork | 1/24/2018 | 1/25/2018 | 1/25/2018 | A | NR |
Dan Ediger
|
|
|
JOB CONTACT - MEL ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. The groundwork isn't complete. The back to back wc's must enter through a fixture fitting. An approved set of plans must be provided for inspection
|