Final | 8/5/2019 | 8/6/2019 | 8/6/2019 | A | PASS |
Matt Wrobel
|
|
|
PADRICK IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Final | 7/1/2019 | 7/2/2019 | 7/2/2019 | A | PART |
Matt Wrobel
|
|
|
PADRAIC IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER hospital side ok to occupy kitchen dw needs rp all ps need certified and 3 sinks remain to be set
|
Final | 6/10/2019 | 6/11/2019 | 6/11/2019 | A | FAIL |
Matt Wrobel
|
|
|
DAVID IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER inspected hospital section only public lave require tempering valves
|
PLM-Aging Inspection | 5/8/2019 | 5/8/2019 | 5/8/2019 | | PART |
Matt Wrobel
|
|
|
wip
|
Extend Permit 180 days | 2/6/2019 | 2/6/2019 | 2/6/2019 | P | PASS |
Dan Ediger
|
|
|
|
Groundwork | 11/29/2018 | 11/30/2018 | 11/30/2018 | A | PASS |
Matt Wrobel
|
|
|
DAVID IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Groundwork | 9/17/2018 | 9/18/2018 | 9/18/2018 | A | PASS |
Dan Ediger
|
|
|
DAVID IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER outside yard hydrants
|
Plumbing Rough-in | 8/31/2018 | 9/4/2018 | 9/4/2018 | A | PART |
Bill VanDegrift
|
|
|
JOB CONTACT IS DAVID Phone #: ###-#### Inspection requested via web by ADAM WARR ri complete except the garage area, med gas pressure test passed.
|
Plumbing Rough-in | 8/30/2018 | 8/31/2018 | 8/31/2018 | P | PART |
Bill VanDegrift
|
|
|
DAVIS IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER cats
|
Plumbing Rough-in | 8/30/2018 | 8/31/2018 | 8/31/2018 | A | PART |
Dan Ediger
|
|
|
DAVIS IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER start med gas 24hr center bld water dwv ok
|
Groundwork | 8/23/2018 | 8/23/2018 | 8/23/2018 | P | PART |
Bill VanDegrift
|
|
|
DAVID IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER exterior hair trap ok to cover
|
Water and/or Sewer | 8/17/2018 | 8/20/2018 | 8/20/2018 | A | PART |
Bill VanDegrift
|
|
|
DAVID IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER water service connection ok
|
Plumbing Rough-in | 6/18/2018 | 6/19/2018 | 6/19/2018 | A | PART |
Dan Ediger
|
|
|
DAVIS IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. West end of the hospital ok to cover
|
Plumbing Rough-in | 6/18/2018 | 6/18/2018 | 6/18/2018 | P | CANC |
Dan Ediger
|
|
|
DAVID IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. Hospital center and east dwv/h2O pressure test ok
|