Final | 4/27/2018 | 4/27/2018 | 4/27/2018 | P | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Nels Moore
|
Pressure Test | 4/5/2018 | 4/5/2018 | 4/5/2018 | P | PASS |
Dan Ediger
|
|
|
Gas line on roof, piped to new RTU and increased size on section of line. Access roof through riser room to the right of the out house in the back of the building. Phone #: ###-#### Inspection requested via web by Nels Moore. 20#
|
Plumbing Rough-in | 3/8/2018 | 3/9/2018 | 3/9/2018 | A | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Nels Moore
|
Groundwork | 2/11/2018 | 2/12/2018 | 2/12/2018 | P | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Nels Moore
|