Final | 5/2/2018 | 5/3/2018 | 5/3/2018 | A | PASS |
Bill VanDegrift
|
|
|
call Brandon prior to arriving for access please Phone #: ###-#### Inspection requested via web by Nicholas Paige
|
Plumbing Rough-in | 4/5/2018 | 4/6/2018 | 4/6/2018 | A | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige. Second half of ti ok to cover
|
Plumbing Rough-in | 2/27/2018 | 2/28/2018 | 2/28/2018 | A | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige. Verify on second half of remodel that air hammer arrestors are installed for all flushometer valves, cleanouts are installed per ISPC 2017 for urinals and back to back fixtures with double santees.
|
Groundwork | 2/14/2018 | 2/14/2018 | 2/14/2018 | P | PASS |
Bill VanDegrift
|
|
|
call prior to arriving Phone #: ###-#### Inspection requested via web by Nicholas Paige 1st floor mens restroom fixture relocation gw ok
|