Final | 11/7/2018 | 11/8/2018 | 11/8/2018 | A | PASS |
Matt Wrobel
|
|
|
Jeff went out and certified back flow Inspection requested via web by Andrea Grigsby 11-8 Backflow has been certified M.W.
|
Plumbing Rough-in | 2/26/2018 | 2/27/2018 | 2/27/2018 | P | PART |
Dan Ediger
|
|
|
Please call Jim 30 min prior to arrival Phone #: ###-#### Inspection requested via web by Andrea . water service and repipe ok. The double check valve needs to be cerified then call for final
|
Final | 2/22/2018 | 2/23/2018 | 2/23/2018 | A | PART |
Dan Ediger
|
|
|
Please call Jimmy 30 min prior to arrival Phone #: ###-#### Inspection requested via web by Andrea Grigsby. sewer ok to cover
|