Final | 9/25/2018 | 9/25/2018 | 9/25/2018 | P | PASS |
Dan Ediger
|
|
|
Should have been finalled earlier-just had underground gas future line inspected this spring on permit. Call with questions Phone #: ###-#### Inspection requested via web by Ben Taylor
|
Final | 2/21/2018 | 2/22/2018 | 2/22/2018 | A | CANC |
Dan Ediger
|
|
|
Calling in gas pressure test, plumbing rough and final all at once. Phone #: ###-#### Inspection requested via web by Ben Taylor20# ok
|
Plumbing Rough-in | 2/21/2018 | 2/22/2018 | 2/22/2018 | A | PASS |
Dan Ediger
|
|
|
Calling in gas pressure test, plumbing rough and final all at once. Phone #: ###-#### Inspection requested via web by Ben Taylor. Gas line underground for a future canopy heater passed 20# test.
|
Pressure Test | 2/21/2018 | 2/22/2018 | 2/22/2018 | A | CANC |
Dan Ediger
|
|
|
Calling in gas pressure test, plumbing rough and final all at once. Phone #: ###-#### Inspection requested via web by Ben Taylor. An underground gas line for a future canopy heater. 20 #
|