PLM-Aging Inspection | 12/24/2018 | 12/24/2018 | 12/24/2018 | | PASS |
Daryl Spivey
|
|
|
|
Final | 12/24/2018 | 12/24/2018 | 12/24/2018 | A | PASS |
Daryl Spivey
|
|
|
repipe to existing fixtures was done..........ds
|
Plumbing Rough-in | 3/6/2018 | 3/6/2018 | 3/6/2018 | P | PASS |
Daryl Spivey
|
|
|
Remaining rough plumbing, kitchen/ downstairs bath Phone #: ###-#### Inspection requested via web by Mike Dunson
|
Plumbing Rough-in | 2/28/2018 | 2/28/2018 | 2/28/2018 | A | PART |
Daryl Spivey
|
|
|
partial rough plbg inspection drain/water lines. **side entrance for basement access. Phone #: ###-#### Inspection requested via web by Mike Dunson g/w and partial roughin ok.........ds
|