PLM-Aging Inspection | 6/22/2020 | 6/22/2020 | 6/22/2020 | | PART |
Matt Wrobel
|
|
|
wip
|
PLM-Request for Extension | 3/23/2020 | 3/23/2020 | 3/23/2020 | P | PASS |
Dan Ediger
|
|
|
2nd extension
|
PLM-Aging Inspection | 3/11/2020 | 3/11/2020 | 3/11/2020 | | PART |
Matt Wrobel
|
|
|
wip
|
Other | 12/11/2019 | 12/12/2019 | 12/12/2019 | A | DONE |
Matt Wrobel
|
|
|
Alex Phone #: 208-###-####
|
PLM-Aging Inspection | 12/11/2019 | 12/11/2019 | 12/12/2019 | | PART |
Matt Wrobel
|
|
|
had conf wip
|
PLM-Request for Extension | 9/11/2019 | 9/11/2019 | 9/11/2019 | P | PART |
Matt Wrobel
|
|
|
ALEX- please call for access Phone #: ###-#### wip
|
PLM-Aging Inspection | 6/28/2019 | 6/28/2019 | 6/28/2019 | | PART |
Matt Wrobel
|
|
|
no calls
|
PLM-Aging Inspection | 3/29/2019 | 3/29/2019 | 4/3/2019 | | PART |
Matt Wrobel
|
|
|
wip
|
PLM-Aging Inspection | 12/28/2018 | 12/28/2018 | 12/28/2018 | | NR |
Matt Wrobel
|
|
|
wip
|
Plumbing Rough-in | 7/5/2018 | 7/5/2018 | 7/5/2018 | P | PASS |
Dan Ediger
|
|
|
Aleksandr Phone #: ###-####
|
Plumbing Rough-in | 7/2/2018 | 7/3/2018 | 7/3/2018 | A | FAIL |
Dan Ediger
|
|
|
Alex-please call 30 mintues prior to meet for access Phone #: ###-####. Change the 3" fitting in the two inch line to two inch. The overhead bath is flat and needs to be repipe with grade/
|
Water and/or Sewer | 3/5/2018 | 3/7/2018 | 3/7/2018 | A | PART |
Dan Ediger
|
|
|
11 am please- call when on your way - Aleksandr Phone #: ###-#### sewer ok. Tied into the existing aba cleanout riser from the basement. States ABS into the basement.
|