Final | 9/18/2018 | 9/19/2018 | 9/19/2018 | A | PASS |
Dan Ediger
|
|
|
Inspection requested via web by Andrea Grigsby
|
Water Heater Final | 3/13/2018 | 3/14/2018 | 3/14/2018 | P | PART |
Dan Ediger
|
|
|
Please call Adam 30 min prior Phone #: ###-#### Inspection requested via web by Andrea Grigsby. Add the value of the water heater and gas line to the re-pipe value before a final can be performed.
|
Pressure Test | 3/13/2018 | 3/14/2018 | 3/14/2018 | P | PART |
Dan Ediger
|
|
|
Please call Adam 30 min prior Phone #: ###-#### Inspection requested via web by Andrea Grigsby. 20# test passed and 5# flue test. The value of the water heater and gas line needs to be added to the permit for a final
|
Water Heater Final | 3/13/2018 | 3/14/2018 | 3/14/2018 | A | CANC |
Dan Ediger
|
|
|
Please call Adam 30 min prior Phone #: ###-#### Inspection requested via web by Andrea Grigsby. Gas and flue pressuer test ok. 20 psi gas. Notified contractor to add the water heater and gas to the permit before final
|