Final | 1/24/2019 | 1/29/2019 | 1/29/2019 | P | PASS |
Matt Wrobel
|
|
|
Phone #: ###-#### Inspection requested via web by PATTY KIRK
|
PLM-Aging Inspection | 1/10/2019 | 1/10/2019 | 1/14/2019 | | PART |
Matt Wrobel
|
|
|
called contractor to schedule
|
Plumbing Rough-in | 3/21/2018 | 3/21/2018 | 3/21/2018 | P | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by PATTY KIRK
|
Plumbing Rough-in | 3/20/2018 | 3/21/2018 | 3/21/2018 | A | NH |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by PATTY KIRK
|
Plumbing Rough-in | 3/19/2018 | 3/19/2018 | 3/19/2018 | P | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by PATTY KIRK.. 1. Install a cleanout at the kitchen sink drain. 2. The PVC waste and overflow cannot be glued to the ABS pipe with ABS glue. Use an approved shielded band
|