PLM-Aging Inspection | 4/11/2019 | 4/11/2019 | 4/11/2019 | | PASS |
Eric Strole
|
|
|
|
DOC - Permit Finaled | 4/11/2019 | 4/11/2019 | 4/11/2019 | A | PASS |
Eric Strole
|
|
|
|
PLM-Aging Inspection | 1/10/2019 | 1/10/2019 | 1/10/2019 | | PART |
Eric Strole
|
|
|
|
Final | 8/9/2018 | 8/9/2018 | 8/9/2018 | P | CANC |
Eric Strole
|
|
|
jeremy fellows ###-####-There are no roof drains, they are all gutters. No inspection required.
|
Pressure Test | 5/30/2018 | 5/30/2018 | 5/30/2018 | P | PASS |
Eric Strole
|
|
|
Clay Phone #: ###-####-Test on waterline pass
|
Water and/or Sewer | 5/24/2018 | 5/25/2018 | 5/25/2018 | A | PART |
Eric Strole
|
|
|
water line // Clay Phone #: ###-####-Water service from meter up to within 5' of building ok to cover, still need to test.
|
Water and/or Sewer | 4/16/2018 | 4/17/2018 | 4/17/2018 | P | PASS |
Eric Strole
|
|
|
Test on interceptor pass
|
Water and/or Sewer | 4/16/2018 | 4/16/2018 | 4/16/2018 | P | PART |
Eric Strole
|
|
|
Jeremy Phone #: ###-####-Start of 24 hr test on grease interceptor.
|
Water and/or Sewer | 3/28/2018 | 3/29/2018 | 3/29/2018 | A | PART |
Eric Strole
|
|
|
Jeremy Phone #: ###-####-4" laterial up to future building and section of sewer main west side towards the east test pass.
|