Final | 12/7/2018 | 12/10/2018 | 12/10/2018 | A | PASS |
Dan Ediger
|
|
|
Please call Mike 30 min prior to arrival Phone #: ###-#### Inspection requested via web by Andrea Grigsby
|
Final | 3/19/2018 | 3/23/2018 | 3/23/2018 | A | FAIL |
Dan Ediger
|
|
|
Please call Nancy prior to showing up ###-#### Phone #: ###-#### Inspection requested via web by Andrea Grigsby. 1. Install a drain pan under the water heater and pipe outside. 2. Pipe the t&p outside from 6" to 18" above the ground. 3. Verify co detectors. 4. Don't cover combustion air or provide new.
|