Final | 7/9/2018 | 7/10/2018 | 7/10/2018 | A | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Ryan Baker
|
Final | 7/5/2018 | 7/6/2018 | 7/6/2018 | A | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Ryan Baker. 1. The T&P drains are trapped in the crawl. Raise the drain and run through the floor joists to the exit bay. 2. The T&P termination must 90 down. 3. Cap the feed line in the crawl to the abandoned vacuum breaker.
|
Final | 6/29/2018 | 7/2/2018 | 7/2/2018 | A | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Ryan Baker. 1. The t&p and pan drains are trapped in the crawl. 2. Locate the irrigation backflow assembly. It must be to code and certified by code.
|
Plumbing Rough-in | 3/28/2018 | 3/28/2018 | 3/28/2018 | A | PASS |
Dan Ediger
|
|
|
Building H for roughin and OK to cover Phone #: ###-#### Inspection requested via web by Ryan Baker
|
Plumbing Rough-in | 3/25/2018 | 3/26/2018 | 3/26/2018 | A | FAIL |
Dan Ediger
|
|
|
Building H the top left of the building is units 1, 3, 5 the bottom left units 2, 4 and 6. To get in all you have to do is pick up the fence and move it, its really easy. All new water, new tub, and only vents out the roof. That is all for the roughin. Please call if you have any questions. If I dont answer please leave a message and I will get back with you as soon as I can. Thanks Dan Phone #: ###-#### Inspection requested via web by Ryan Baker. 1. The t&p in unit H6 is backgrading. 2. Pipe the T&P and drain pans on all first floor units to the outside. 3. Bring the irrigation backflow up to code. PVB, Double check or RP.
|
Plumbing Rough-in | 3/21/2018 | 3/22/2018 | 3/22/2018 | A | PEND |
Dan Ediger
|
|
|
Pull apart the fence to get in.. Any questions please call me.. Phone #: ###-#### (NO BUILDING PERMIT YET) Inspection requested via web by Ryan Baker. Need unit numbers for inspection
|