Final | 7/12/2018 | 7/13/2018 | 7/13/2018 | A | PASS |
Bill VanDegrift
|
|
|
CHARLIE IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER final ok no access to room 124 but if it's like the rest of the rooms it's ok.
|
Plumbing Rough-in | 6/25/2018 | 6/25/2018 | 6/25/2018 | P | PASS |
Eric Strole
|
|
|
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Final | 6/12/2018 | 6/13/2018 | 6/13/2018 | A | PART |
Eric Strole
|
|
|
JAMES IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-2nd floor final ok.
|
Plumbing Rough-in | 5/15/2018 | 5/16/2018 | 5/16/2018 | A | PART |
Bill VanDegrift
|
|
|
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER 2rd floor complete
|
Final | 4/30/2018 | 5/1/2018 | 5/1/2018 | A | PART |
Eric Strole
|
|
|
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-3rd floor final pass.
|
Final | 4/27/2018 | 4/30/2018 | 4/30/2018 | A | PART |
Eric Strole
|
|
|
THIS IS FOR THE 3RD FLOOR, MATT IS THE CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-North side 3rd floor pass.
|
Plumbing Rough-in | 4/5/2018 | 4/6/2018 | 4/6/2018 | A | PART |
Daryl Spivey
|
|
|
MATT IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER 3rd floor rough in complete..........ds
|
Other | 3/26/2018 | 3/27/2018 | 3/27/2018 | A | DONE |
Eric Strole
|
|
|
RILEY IS REQUESTING A CONSULT. HIS NUMBER IS ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Conferance on showers. Vertical stacks are all 1 1/2". Would be major upgrade to step up all plumbing. Contractor and general contractor are aware of sizing issues if future problems occur.
|