Water Heater Final | 4/25/2018 | 4/27/2018 | 4/27/2018 | A | PASS |
Dan Ediger
|
|
|
re-inspection for corrections. Please call before arrival. Phone #: ###-#### Inspection requested via web by JEREMY LINK
|
Water Heater Final | 4/19/2018 | 4/20/2018 | 4/20/2018 | A | FAIL |
Dan Ediger
|
|
|
Please call ahead when in route Phone #: ###-#### Inspection requested via web by JEREMY LINK. The t&p drain line needs to be lowered to 6" above the slab. the homeowner requests that you turn the temperature up
|