Final | 7/27/2018 | 7/30/2018 | 7/30/2018 | A | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
Plumbing Rough-in | 4/23/2018 | 4/23/2018 | 4/23/2018 | P | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
Plumbing Rough-in | 4/20/2018 | 4/20/2018 | 4/20/2018 | P | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen. Waste pressure test failed. Pipe the 3" south cleanout to the access side fo the pony wall for an 18"x30" clearence
|