Final | 6/21/2018 | 6/22/2018 | 6/22/2018 | P | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
Final | 6/20/2018 | 6/21/2018 | 6/21/2018 | A | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen. Test equipment was left on the roof at vent termination.
|
Plumbing Rough-in | 4/24/2018 | 4/24/2018 | 4/24/2018 | P | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|