Final | 10/3/2018 | 10/4/2018 | 10/4/2018 | A | PASS |
Eric Strole
|
|
|
3024 enter Phone #: ###-#### Inspection requested via web by Ann Marie Reyes
|
Storm Drains | 8/2/2018 | 8/2/2018 | 8/2/2018 | P | PASS |
Eric Strole
|
|
|
JOB # 19684 Phone #: ###-#### Inspection requested via web by Ann Marie Reyes-Deck drain pass.
|
Plumbing Rough-in | 7/24/2018 | 7/25/2018 | 7/25/2018 | P | PASS |
Eric Strole
|
|
|
JOB # 19684 Phone #: ###-#### Inspection requested via web by Ann Marie Reyes
|
Plumbing Rough-in | 5/23/2018 | 5/24/2018 | 5/24/2018 | A | NR |
Eric Strole
|
|
|
John-partial for water supply to wall going to safety shower Phone #: ###-####-Not ready
|
Groundwork | 4/26/2018 | 4/27/2018 | 4/27/2018 | P | PASS |
Eric Strole
|
|
|
JOB # 19684 Phone #: ###-#### Inspection requested via web by Ann Marie Reyes
|