Final | 6/4/2018 | 6/5/2018 | 6/5/2018 | A | PASS |
Dan Ediger
|
|
|
FIRST AM PLEASE Phone #: ###-#### Inspection requested via web by Chris Field
|
Final | 6/4/2018 | 6/4/2018 | 6/4/2018 | P | NH |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Chris Field
|
Final | 5/15/2018 | 5/16/2018 | 5/16/2018 | A | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Chris Field. Provide information on the humifier. The drain on the ro system cannot connect directly without an airgap, unless the RO is protected on the feed side.
|
Plumbing Rough-in | 4/24/2018 | 4/25/2018 | 4/25/2018 | A | PART |
Dan Ediger
|
|
|
CONTRACTOR:TIM LENBERG, ###-####. WE ARE DOING THE ROUGH PLUMBING ONLY. FINAL FIXTURES TRIM BY OWNER OR OWNER AGENT. **MOVE ISLAND SINK VENT ; RUN DRAIN ; WATER FOR BAR* Phone #: ###-#### Inspection requested via web by Chris Field. Ice maker and island vent relocate ok. Recall after the ks drain is moved.
|