Final | 8/3/2018 | 8/3/2018 | 8/3/2018 | A | PASS |
Dan Ediger
|
|
|
|
DOC - Permit Finaled | 8/2/2018 | 8/2/2018 | 8/2/2018 | P | PASS |
Dan Ediger
|
|
|
|
Final | 7/31/2018 | 8/1/2018 | 8/1/2018 | A | NR |
Dan Ediger
|
|
|
CHRIS IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Final | 7/31/2018 | 7/31/2018 | 7/31/2018 | P | NR |
Dan Ediger
|
|
|
Ice maker rp and irrigation dc need certified.
|
Final | 7/30/2018 | 7/30/2018 | 7/30/2018 | P | PART |
Dan Ediger
|
|
|
CHRIS IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. Provide a safety restraint for the water heaters
|
Final | 7/26/2018 | 7/27/2018 | 7/27/2018 | P | NH |
Dan Ediger
|
|
|
CHRIS IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER no access
|
Final | 7/25/2018 | 7/26/2018 | 7/26/2018 | P | NR |
Dan Ediger
|
|
|
CHRIS IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Plumbing Rough-in | 7/13/2018 | 7/16/2018 | 7/16/2018 | A | PASS |
Dan Ediger
|
|
|
RYAN IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. The pvc pipe in the return air plenum has been fire wrapped with an apporved 3M wrap. OK to cover.
|
Plumbing Rough-in | 6/25/2018 | 6/26/2018 | 6/26/2018 | A | PASS |
Dan Ediger
|
|
|
RYAN IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Groundwork | 6/8/2018 | 6/11/2018 | 6/11/2018 | A | PASS |
Dan Ediger
|
|
|
JOB CONTACT - RYAN ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Plumbing Rough-in | 5/25/2018 | 5/25/2018 | 5/25/2018 | A | FAIL |
Dan Ediger
|
|
|
Please verify the depth of the furthest upsrteam point of 4" drain to verify that an effluent pump is required. Do not cover any plumbing walls in the downstair bathrooms, all others ok Left correction notice
|
Plumbing Rough-in | 5/24/2018 | 5/24/2018 | 5/24/2018 | P | PART |
Dan Ediger
|
|
|
HENRY IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER. Mark with Buss is going to have the engineer review the scheduled pumps. The dishcharge is too high for the pipe size available. OK to cover the walls.
|
Groundwork | 5/9/2018 | 5/10/2018 | 5/10/2018 | A | PASS |
Dan Ediger
|
|
|
MEL IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|