Pressure Test | 5/11/2018 | 5/11/2018 | 5/11/2018 | P | PASS |
Dan Ediger
|
|
|
Makenna Phone #: ###-#### 20# second test after pipe was rerouted.
|
DOC - Permit Finaled | 5/11/2018 | 5/11/2018 | 5/11/2018 | P | PASS |
Dan Ediger
|
|
|
Pressure test and final ok
|
Water Heater Final | 4/27/2018 | 4/30/2018 | 4/30/2018 | A | CANC |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by McKenna Haycock. The gas line is being relocated. Call for pressure test prior to final
|
Water Heater Final | 4/26/2018 | 4/27/2018 | 4/26/2018 | P | CANC |
Dan Ediger
|
|
|
Gas water heater inspection Phone #: ###-#### >> Inspection requested via web by McKenna Haycock Inspection cancelled from web by: McKenna Haycock
|
Other | 4/25/2018 | 4/26/2018 | 4/26/2018 | A | PASS |
Dan Ediger
|
|
|
Partial inspection on flue pipe installation. Water heater is being installed after and we will schedule that inspection. Phone #: ###-#### Inspection requested via web by McKenna Haycock. Flue pressure test ok Gas 20# test ok. Verify with the installation instructions on your final flue termination from the windo and attic vent.
|