DOC - Permit Finaled | 5/6/2019 | 5/6/2019 | 5/6/2019 | P | PASS |
Dan Ediger
|
|
|
flue was tested by the mechanical contractor
|
PLM-Aging Inspection | 3/6/2019 | 3/6/2019 | 3/6/2019 | | PART |
Matt Wrobel
|
|
|
left notice to call for inspection
|
Plumbing Rough-in | 9/17/2018 | 9/17/2018 | 9/17/2018 | P | CANC |
Dan Ediger
|
|
|
wrong address
|
Final | 5/8/2018 | 5/9/2018 | 5/9/2018 | P | FAIL |
Dan Ediger
|
|
|
Brian Scoles is scheduled to do pm HVAC final inspection. Call Brenda @ ###-#### before going to inspection Inspection requested via web by Sharon Afinson. Need to pressure test the flue.
|