Final | 3/14/2019 | 3/14/2019 | 3/14/2019 | P | PASS |
Daryl Spivey
|
|
|
Ready for final plumbing inspection. Domonic will be on site, the general conrtractor for access. Phone #: ###-#### Inspection requested via web by Scott Sparrell
|
PLM-Aging Inspection | 3/12/2019 | 3/12/2019 | 3/12/2019 | | PEND |
Daryl Spivey
|
|
|
|
Plumbing Rough-in | 7/31/2018 | 7/31/2018 | 7/31/2018 | P | PASS |
Daryl Spivey
|
|
|
Rough in complete in existing garage modifications. Kitchen, utility sink, powder bathroom. Under test and ready for inspection. Hasib is contact if questions. Phone #: ###-#### Inspection requested via web by Scott Sparrell
|
Plumbing Rough-in | 7/18/2018 | 7/18/2018 | 7/18/2018 | P | PART |
Bill VanDegrift
|
|
|
Groundwork in existing garage for kitchen, utility sink, bathroom. ADU is roughed in and under test. Hasib is contact on site. Phone #: ###-#### Inspection requested via web by Scott gw in the old garage ok, ADU ri ok
|
Groundwork | 5/14/2018 | 5/14/2018 | 5/14/2018 | P | PART |
Daryl Spivey
|
|
|
Groundwork inspection for exterior sewer and water. ADU, existing garage. Phone #: ###-#### Inspection requested via web by Scott Sparrell outside waste........ds
|
Groundwork | 5/14/2018 | 5/14/2018 | 5/14/2018 | A | CANC |
Daryl Spivey
|
|
|
Groundwork is ready this morning. Hasib is contact. Phone #: ###-#### >> Inspection requested via web by Scott Sparrell Inspection cancelled from web by: Scott Sparrell
|