Final | 8/24/2018 | 8/24/2018 | 8/24/2018 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Nels Moore
|
Pressure Test | 8/21/2018 | 8/21/2018 | 8/21/2018 | P | PASS |
Eric Strole
|
|
|
high pressure at meter Phone #: ###-#### Inspection requested via web by Nels Moore-60 lb gas test pass.
|
Pressure Test | 8/21/2018 | 8/21/2018 | 8/21/2018 | A | PART |
Eric Strole
|
|
|
Test on gas line at meter on the south side of building. Low pressure test on gas line in west and north mechanical rooms. Pressure test on PVC flue for water heater Phone #: ###-#### Inspection requested via web by Nels Moore-20 lb gas test north & west mechanical rooms pass. (60 lb gas test at meter gauge will not zero out.) Test on w/h flue pass.
|
Plumbing Rough-in | 7/17/2018 | 7/17/2018 | 7/17/2018 | P | PASS |
Bill VanDegrift
|
|
|
Phone #: ###-#### Inspection requested via web by Nels Moore ri complete
|
Plumbing Rough-in | 6/18/2018 | 6/18/2018 | 6/18/2018 | A | PART |
Eric Strole
|
|
|
Partial roughin front Phone #: ###-#### Inspection requested via web by Nels Moore-East half of building pass.
|
Groundwork | 5/24/2018 | 5/24/2018 | 5/24/2018 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Nels Moore-Ground work and underground water supply pass.
|
Groundwork | 5/15/2018 | 5/16/2018 | 5/16/2018 | A | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Nels Moore-Section of ground work complete is marked on plans.
|