Final | 8/2/2018 | 8/2/2018 | 8/2/2018 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Chris Field
|
Plumbing Rough-in | 5/25/2018 | 5/25/2018 | 5/25/2018 | P | PASS |
Eric Strole
|
|
|
MUST CALL 30 MIN AHEAD TO MEET: LLOYD, ###-####
Master bath remodel rough in Phone #: ###-#### Inspection requested via web by Chris Field-rough-in pass. Shower valve covered up before being inspected.
|
Plumbing Rough-in | 5/25/2018 | 5/25/2018 | 5/25/2018 | P | CANC |
Eric Strole
|
|
|
owner: Catherine Kane, ###-####, contractor: Lloyd, ###-#### master bath remodel rough in Phone #: ###-#### >> Inspection requested via web by Chris Field Inspection cancelled from web by: Chris Field
|