Final | 8/15/2018 | 8/15/2018 | 8/15/2018 | P | PASS |
Dan Ediger
|
|
|
|
Final | 8/6/2018 | 8/7/2018 | 8/7/2018 | P | PART |
Dan Ediger
|
|
|
If questions call Efrain @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann. Supply engineer documentation to eleminate the tempering valve and change the water heater type
|
Other | 6/28/2018 | 6/29/2018 | 6/29/2018 | A | CANC |
Dan Ediger
|
|
|
Water Service inspection. If questions call Chad @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann. Was updated as a water service inspection.
|
Water and/or Sewer | 6/29/2018 | 6/29/2018 | 6/29/2018 | P | PASS |
Dan Ediger
|
|
|
Water Service inspection. If questions call Chad @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann, Pass the new water servoce for cover. The service runs to two buildings and will require double chedk valves at both locations. The permit value will need to be updated.
|
Plumbing Rough-in | 6/19/2018 | 6/20/2018 | 6/20/2018 | A | PASS |
Dan Ediger
|
|
|
if questions call Efrain @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
Water and/or Sewer | 6/18/2018 | 6/18/2018 | 6/18/2018 | P | PART |
Dan Ediger
|
|
|
water service/ Underground. If questions call Chad @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann. 2" poly ran from the east end of the utiility parking building and bored past the maintance buildings to the west. Call for final when the service is ran into the west end buildings.
|
Groundwork | 5/17/2018 | 5/17/2018 | 5/17/2018 | P | PASS |
Dan Ediger
|
|
|
if questions call Efrain @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann
|