PLM-Aging Inspection | 3/15/2019 | 3/15/2019 | 3/15/2019 | | PASS |
Matt Wrobel
|
|
|
backflow certified
|
DOC - Permit Finaled | 3/15/2019 | 3/15/2019 | 3/15/2019 | P | PASS |
Matt Wrobel
|
|
|
backflow certified
|
Sprinkler (Final) | 7/6/2018 | 7/6/2018 | 7/6/2018 | P | FAIL |
Dan Ediger
|
|
|
This permit was reactivated due to the risers coming up on an angle. The PVB must be in the vertical position.
|
Sprinkler (Final) | 5/18/2018 | 5/18/2018 | 5/18/2018 | P | PASS |
Dan Ediger
|
|
|
Backflow prevention inspection Phone #: ###-#### Inspection requested via web by david Fuller
|