Plumbing Rough-in | 9/16/2019 | 9/17/2019 | 9/17/2019 | A | PASS |
Matt Wrobel
|
|
|
Gas line inspection. Phone #: ###-#### Inspection requested via web by Mark Tongen
|
DOC - Permit Finaled | 9/17/2019 | 9/17/2019 | 9/17/2019 | P | PASS |
Matt Wrobel
|
|
|
|
Final | 9/6/2019 | 9/10/2019 | 9/9/2019 | A | CANC |
Matt Wrobel
|
|
|
Call for access- Mark Phone #: ###-#### Inspection cancelled from web by: Mark Tongen
|
PLM-Aging Inspection | 8/5/2019 | 8/5/2019 | 8/5/2019 | | FAIL |
Matt Wrobel
|
|
|
no calls
|
Other | 5/6/2019 | 5/6/2019 | 5/7/2019 | A | PASS |
Dan Ediger
|
|
|
verify gas not hooked up that failed inspection. Left correction notice to expose the gas line and call for an inspection within 5 business days.
|
PLM-Aging Inspection | 3/18/2019 | 3/18/2019 | 3/21/2019 | | PART |
Matt Wrobel
|
|
|
eft notice to call for inspection
|
Other | 6/20/2018 | 6/21/2018 | 6/21/2018 | A | FAIL |
Dan Ediger
|
|
|
Gas pressure test inspection. If I am needing to be present for the inspection, please call ahead so that I may meet you there. Phone #: ###-#### Inspection requested via web by Mark Tongen. The entire gas line must be exposed for the entire length for inspection.
|
Water and/or Sewer | 6/20/2018 | 6/21/2018 | 6/20/2018 | A | CANC |
Dan Ediger
|
|
|
If I am needing to be present for the inspection, please give me a call so I can meet you there. Phone #: ###-#### >> Inspection requested via web by Mark Tongen Inspection cancelled from web by: Mark Tongen
|
Other | 5/21/2018 | 5/22/2018 | 5/22/2018 | A | NR |
Dan Ediger
|
|
|
Gas pressure test. Phone #: ###-#### Inspection requested via web by Mark Tongen
|
Other | 5/20/2018 | 5/22/2018 | 5/21/2018 | A | CANC |
Dan Ediger
|
|
|
Gas line pressure test. Phone #: ###-#### >> Inspection requested via web by Mark Tongen Inspection cancelled from web by: Mark Tongen
|