Final | 10/30/2018 | 10/31/2018 | 10/31/2018 | A | PASS |
Dan Ediger
|
|
|
give me a call to let you in thanks Phone #: ###-#### Inspection requested via web by Frank Young
|
Final | 10/28/2018 | 10/29/2018 | 10/29/2018 | A | PART |
Dan Ediger
|
|
|
Let me know when you are ready and i will let you in thanks Phone #: ###-#### Inspection requested via web by Frank Young part. need indirect drains on d.w. and softener drains per i.s.p.c. .-need to check if double check is approved for vertical installation-water closet tanks need to have handles on open side of room for A.D.A. - install sink behind bar. m.w.
|
Plumbing Rough-in | 8/6/2018 | 8/7/2018 | 8/7/2018 | A | PASS |
Bill VanDegrift
|
|
|
let me know what time you will be there i will let you in thanks Phone #: ###-#### Inspection requested via web by Frank Young ri ok ok to cover
|
Groundwork | 6/25/2018 | 6/26/2018 | 6/26/2018 | A | PASS |
Dan Ediger
|
|
|
Call me and i will let you in thanks Phone #: ###-#### Inspection requested via web by Frank Young
|
Groundwork | 6/17/2018 | 6/18/2018 | 6/18/2018 | A | PART |
Bill VanDegrift
|
|
|
call me will let you in to building Phone #: ###-#### Inspection requested via web by Frank Young partial gw ok, everything except the future brewery area ok
|