Final | 10/4/2018 | 10/4/2018 | 10/4/2018 | P | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by TOBI WLSON. The R-In inspection should have been coded as final.
|
Plumbing Rough-in | 7/19/2018 | 7/20/2018 | 7/20/2018 | A | PASS |
Dan Ediger
|
|
|
Key is on the ledge above the door. Phone #: ###-#### Inspection requested via web by TOBI WLSON
|
Plumbing Rough-in | 7/19/2018 | 7/20/2018 | 7/19/2018 | A | CANC |
Dan Ediger
|
|
|
Phone #: ###-#### >> Inspection requested via web by TOBI WLSON Inspection cancelled from web by: TOBI WLSON
|
Final | 7/19/2018 | 7/20/2018 | 7/19/2018 | A | CANC |
Dan Ediger
|
|
|
Phone #: ###-#### >> Inspection requested via web by TOBI WLSON Inspection cancelled from web by: TOBI WLSON
|
Plumbing Rough-in | 7/9/2018 | 7/10/2018 | 7/10/2018 | A | FAIL |
Dan Ediger
|
|
|
Key is on the ledge above the door. Nobody lives there currently. Phone #: ###-#### Inspection requested via web by TOBI WLSON 1. The water heater flue requires a 1" clearance from all combustable material. 2. The T&P drain must be ran to the exterior or an approved location. If trapped drill an 1/8" hole in the low point. 3. Provide and air gap at the water softener drain termination.
|
Plumbing Rough-in | 7/3/2018 | 7/5/2018 | 7/5/2018 | A | NH |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by TOBI WLSON
|