Sprinkler (Final) | 6/19/2018 | 6/19/2018 | 6/19/2018 | A | PASS |
Bill VanDegrift
|
|
|
leak was on the sprinkler side
|
Sprinkler (Final) | 6/18/2018 | 6/19/2018 | 6/19/2018 | A | NR |
Bill VanDegrift
|
|
|
Inspection requested via web by Michael McDonald, find leak, recall when ready.
|
Sprinkler (Final) | 6/7/2018 | 6/8/2018 | 6/8/2018 | A | FAIL |
Bill VanDegrift
|
|
|
Inspection requested via web by Michael McDonald 1) 160 psi minimum poly required upstream of the PVB 2) PVB must be a minimum of 12 inches above grade. 3) connection to main is flooded can not inspect.
|