Final | 10/25/2018 | 10/26/2018 | 10/26/2018 | A | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Robert Frazier
|
Final | 10/14/2018 | 10/17/2018 | 10/17/2018 | P | NR |
Dan Ediger
|
|
|
Please call to clarify correction notice Phone #: ###-#### Inspection requested via web by Robert Frazier. consult
|
Final | 10/5/2018 | 10/8/2018 | 10/8/2018 | A | FAIL |
Dan Ediger
|
|
|
The weir of the trap is above the vent. Lower the trap or raise the trap arem
|
Final | 10/4/2018 | 10/5/2018 | 10/5/2018 | P | CANC |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Robert Frazier Rescheduled
|
Plumbing Rough-in | 7/25/2018 | 7/26/2018 | 7/26/2018 | A | PASS |
Dan Ediger
|
|
|
|
Plumbing Rough-in | 7/24/2018 | 7/25/2018 | 7/25/2018 | A | NR |
Dan Ediger
|
|
|
Ready to test Phone #: ###-#### Inspection requested via web by Robert Frazier
|
Plumbing Rough-in | 7/24/2018 | 7/24/2018 | 7/24/2018 | P | CANC |
Dan Ediger
|
|
|
Phone #: ###-#### >> Inspection requested via web by Robert Frazier Inspection cancelled from web by: Robert Frazier
|
Plumbing Rough-in | 7/23/2018 | 7/24/2018 | 7/24/2018 | A | CANC |
Dan Ediger
|
|
|
Phone #: ###-#### >> Inspection requested via web by Robert Frazier Inspection cancelled from web by: Robert Frazier
|
Plumbing Rough-in | 7/22/2018 | 7/23/2018 | 7/23/2018 | P | CANC |
Dan Ediger
|
|
|
Test and rough inspection Phone #: ###-#### >> Inspection requested via web by Robert Frazier Inspection cancelled from web by: Robert Frazier
|
Plumbing Rough-in | 7/20/2018 | 7/20/2018 | 7/20/2018 | P | PART |
Dan Ediger
|
|
|
Walk through sewer rough in Phone #: ###-#### Inspection requested via web by Robert Frazier. Conference
|
Plumbing Rough-in | 7/12/2018 | 7/13/2018 | 7/13/2018 | A | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Robert Frazier. 1. Drew an isometric drawing with fitting list to show all the changes. Needs a test
|
Plumbing Rough-in | 6/14/2018 | 6/14/2018 | 6/14/2018 | P | PASS |
Dan Ediger
|
|
|
Robert Phone #: ###-####
|
Plumbing Rough-in | 6/13/2018 | 6/14/2018 | 6/14/2018 | A | FAIL |
Dan Ediger
|
|
|
Robert Phone #: ###-####. 1/4 bend on the trap arm must stub straight out so the trap is below the vent opening. pressure test and reschedule.
|
Plumbing Rough-in | 6/12/2018 | 6/13/2018 | 6/13/2018 | P | CANC |
Dan Ediger
|
|
|
Robert Phone #: ###-####
|
Other | 6/12/2018 | 6/12/2018 | 6/12/2018 | P | PASS |
Dan Ediger
|
|
|
Robert Phone #: ###-####
|
Plumbing Rough-in | 6/11/2018 | 6/11/2018 | 6/11/2018 | P | PEND |
Dan Ediger
|
|
|
Robert Phone #: ###-####. Conference
|