Final | 12/3/2018 | 12/3/2018 | 12/3/2018 | P | PASS |
Matt Wrobel
|
|
|
Carrie Phone #: ###-####
|
Roof Drains | 9/25/2018 | 9/27/2018 | 9/27/2018 | A | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
Groundwork | 6/21/2018 | 6/22/2018 | 6/22/2018 | P | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen
|
Groundwork | 6/21/2018 | 6/21/2018 | 6/21/2018 | P | FAIL |
Dan Ediger
|
|
|
Grease line drain is backgrading by the foundation wall
|
Groundwork | 6/20/2018 | 6/21/2018 | 6/21/2018 | P | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen. Failed waste pressure test. Water and vent ok
|
Groundwork | 6/20/2018 | 6/20/2018 | 6/20/2018 | P | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen. No approved plans on site. Notified installer earlier today to have tham here before calling in an inspection.
|