Final | 9/21/2018 | 9/24/2018 | 9/24/2018 | A | PASS |
Dan Ediger
|
|
|
Inspection requested via web by Nicholas Paige
|
Final | 9/21/2018 | 9/21/2018 | 9/21/2018 | P | FAIL |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige ADA drinking fountain needs caulked all else ok
|
Water and/or Sewer | 8/31/2018 | 8/31/2018 | 8/31/2018 | P | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige. Checked the water service into the building
|
Plumbing Rough-in | 7/30/2018 | 7/31/2018 | 7/31/2018 | A | PASS |
Dan Ediger
|
|
|
Please call Jimmy for coordination. Phone #: ###-#### Inspection requested via web by Nicholas Paige. Verify the air hammer arrestor for the urianals on trim.
|
Groundwork | 7/2/2018 | 7/3/2018 | 7/3/2018 | P | PART |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Nicholas Paige. GW in the restrooms and riser for the ejector. Verify water sizing
|
Other | 6/21/2018 | 6/22/2018 | 6/22/2018 | A | PASS |
Dan Ediger
|
|
|
8 am on site if at all possible
thanks, Phone #: ###-#### Inspection requested via web by Nicholas Paige the pump is approx 25gpm which will require a 4" gravity drain and 3/4 water line.
|