Permit Number | PLM18-02661 |
Status | Finaled |
Name |
LUCHINI TAMI HARPHAM
|
Site Address |
300 S HARDING ST
|
Project Name | |
Customer Number | |
ePlanReview | No |
Description |
Homeowner Online - Alteration or Repair: Replace run of galvanized piping to main bathroom, replace vanity, toilet (replace/reuse), replace tub and shower faucets as needed. Drain piping will be reused.
|