Final | 9/27/2018 | 9/27/2018 | 9/27/2018 | P | PASS |
Dan Ediger
|
|
|
Right hand toilet tank was installed. Thank you Phone #: ###-#### Inspection requested via web by Jennifer Alcala
|
Final | 9/13/2018 | 9/13/2018 | 9/13/2018 | P | PART |
Dan Ediger
|
|
|
Please call Johnny when on the way ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Jennifer Alcala. Wating on rh flush wc for kiddy bath
|
Final | 9/6/2018 | 9/7/2018 | 9/7/2018 | P | FAIL |
Dan Ediger
|
|
|
Please call Johnny when on the way ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Jennifer Alcala 1. Install right hand flush levers on ada wc's set left of the lavs. 2. Install a temperature limiting valve at the water heater or at all the lav faucets. 3. The premise protection is due to be certified
|
Plumbing Rough-in | 7/21/2018 | 7/23/2018 | 7/23/2018 | A | PASS |
Bill VanDegrift
|
|
|
Please call Johnny with questions ###-####. Thank you Phone #: ###-#### Inspection requested via web by Jennifer Alcala ri ok
|
Groundwork | 6/27/2018 | 6/28/2018 | 6/28/2018 | A | PASS |
Dan Ediger
|
|
|
Please call Johnny when on the way ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Jennifer Alcala
|
Groundwork | 6/27/2018 | 6/28/2018 | 6/27/2018 | P | CANC |
Dan Ediger
|
|
|
Please call Johnny when on the way ###-####. Thank you. Phone #: ###-#### >> Inspection requested via web by Jennifer Alcala Inspection cancelled from web by: Jennifer Alcala
|