Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberPLM18-02708
StatusFinaled
Name ALL STAR PLUMBING
Site Address 1471 S VINNELL WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
Addition: Ground work, rough-in. Install new water piping downstream of the existing shutoff valves and run new vents to the ceiling at the existing vent stubs.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final9/27/20189/27/20189/27/2018PPASS
DetailsDan Ediger
Right hand toilet tank was installed. Thank you Phone #: ###-#### Inspection requested via web by Jennifer Alcala
Final9/13/20189/13/20189/13/2018PPART
DetailsDan Ediger
Please call Johnny when on the way ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Jennifer Alcala.
Wating on rh flush wc for kiddy bath
Final9/6/20189/7/20189/7/2018PFAIL
DetailsDan Ediger
Please call Johnny when on the way ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Jennifer Alcala
1. Install right hand flush levers on ada wc's set left of the lavs.
2. Install a temperature limiting valve at the water heater or at all the lav faucets.
3. The premise protection is due to be certified
Plumbing Rough-in7/21/20187/23/20187/23/2018APASS
DetailsBill VanDegrift
Please call Johnny with questions ###-####. Thank you Phone #: ###-#### Inspection requested via web by Jennifer Alcala ri ok
Groundwork6/27/20186/28/20186/28/2018APASS
DetailsDan Ediger
Please call Johnny when on the way ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Jennifer Alcala
Groundwork6/27/20186/28/20186/27/2018PCANC
DetailsDan Ediger
Please call Johnny when on the way ###-####. Thank you. Phone #: ###-#### >> Inspection requested via web by Jennifer Alcala Inspection cancelled from web by: Jennifer Alcala