Final | 9/18/2019 | 9/19/2019 | 9/19/2019 | P | PASS |
Matt Wrobel
|
|
|
Please call Pat prior to arrival ###-####. Thank you! Phone #: ###-#### Inspection requested via web by Maira Napoles
|
Final | 9/9/2019 | 9/10/2019 | 9/10/2019 | P | PART |
Matt Wrobel
|
|
|
Please call Pat prior to arrival at ###-#### Phone #: ###-#### Inspection requested via web by Maira Napoles need add rp for dw in kitchen
|
PLM-Aging Inspection | 7/23/2019 | 7/23/2019 | 7/23/2019 | | PART |
Matt Wrobel
|
|
|
wip
|
Plumbing Rough-in | 4/23/2019 | 4/23/2019 | 4/23/2019 | P | PART |
Matt Wrobel
|
|
|
Please call Pat prior to arrival at ###-####. Thank you! Phone #: ###-#### Inspection requested via web by Maira Napoles rough in complete except mech room andbldg.supply room exposed piping
|
Plumbing Rough-in | 4/15/2019 | 4/15/2019 | 4/15/2019 | P | PART |
Matt Wrobel
|
|
|
Please call Patrick prior to arrival at ###-####. Thank you! Phone #: ###-#### Inspection requested via web by Maira Napoles kitchen rough in and s.w. bathroom walls ok to cover 1st floor
|
Groundwork | 8/29/2018 | 8/29/2018 | 8/29/2018 | P | PART |
Bill VanDegrift
|
|
|
Please call Scott prior to arrival at ###-#### Phone #: ###-#### Inspection requested via web by Heidi Lukecart east end gw ok
|
Groundwork | 8/24/2018 | 8/24/2018 | 8/24/2018 | P | PART |
Bill VanDegrift
|
|
|
Please call Patrick prior to arrival at ###-####.0 Phone #: ###-#### Inspection requested via web by Maira Napoles South-East rr's and mech room ok to cover
|
Groundwork | 8/22/2018 | 8/22/2018 | 8/22/2018 | P | PASS |
Bill VanDegrift
|
|
|
Please call Patrick prior to arrival at ###-####. The inspection will be on a grease interceptor. Phone #: ###-#### Inspection requested via web by Maira Napoles ok to cover the interceptor. test has been on for almost 24 hours already.
|
Groundwork | 8/17/2018 | 8/17/2018 | 8/17/2018 | A | PART |
Dan Ediger
|
|
|
Please call Patrick prior to arrival: 2082500899 Phone #: ###-#### Inspection requested via web by Heidi Lukecart. SW kitchen grease line ok to cover. complets west end gw. Will add a 3" cleanout to 3 comp. sink floor sink
|
Groundwork | 8/14/2018 | 8/14/2018 | 8/14/2018 | P | PART |
Dan Ediger
|
|
|
Please call Patrick prior to arrival at ###-#### Phone #: ###-#### Inspection requested via web by Maira Napoles Grease line ok to cover The double combi's need to be replaced by fixture fittings on the two sets of back to back water closets.
|
Groundwork | 8/9/2018 | 8/10/2018 | 8/10/2018 | A | PART |
Eric Strole
|
|
|
Please call Pat prior to arrival at ###-####. Thank you! Phone #: ###-#### Inspection requested via web by Maira Napoles-Section complete is marked on plans.
|
Plumbing Rough-in | 8/2/2018 | 8/2/2018 | 8/2/2018 | P | PART |
Dan Ediger
|
|
|
Please call Patrick prior to arrival at ###-####. Phone #: ###-#### Inspection requested via web by Maira Napoles. Main drain on Southwest corner. Branch lines later
|
Plumbing Rough-in | 8/1/2018 | 8/1/2018 | 8/1/2018 | P | PART |
Dan Ediger
|
|
|
Please call Patrick prior to arrival at ###-####. Thank you! Phone #: ###-#### Inspection requested via web by Maira Napoles. Water service into the mecanical room ok to cover
|