Final | 11/12/2018 | 11/13/2018 | 11/13/2018 | A | PASS |
Eric Strole
|
|
|
MARK IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Final | 7/26/2018 | 7/27/2018 | 7/27/2018 | A | PART |
Eric Strole
|
|
|
DUSTIN IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Temp final ok.
|
Final | 7/26/2018 | 7/27/2018 | 7/26/2018 | P | CANC |
Eric Strole
|
|
|
DUSTIN IS THE JOB CONTACT ###-#### Phone #: ###-#### >> Inspection requested via web by BECCA DUMMER Inspection cancelled from web by: BECCA DUMMER
|
Final | 7/24/2018 | 7/26/2018 | 7/26/2018 | P | FAIL |
Eric Strole
|
|
|
ANDY IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Need all equipment installed. Need to caulk all sinks. RPBA needs tested. Need to uncover flow control and install access cover.
|
Plumbing Rough-in | 7/17/2018 | 7/17/2018 | 7/17/2018 | P | PASS |
Eric Strole
|
|
|
ANDY IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
Groundwork | 7/13/2018 | 7/13/2018 | 7/13/2018 | P | PASS |
Eric Strole
|
|
|
|
Groundwork | 7/12/2018 | 7/13/2018 | 7/13/2018 | A | FAIL |
Eric Strole
|
|
|
ANDY IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-Need approved plans on site for inspection.
|