Final | 7/20/2018 | 7/23/2018 | 7/23/2018 | P | PASS |
Bill VanDegrift
|
|
|
JT Phone #: ###-#### dan already looked at the dcva
|
Final | 7/19/2018 | 7/20/2018 | 7/20/2018 | P | PART |
Dan Ediger
|
|
|
Please contact JT Waters with any questions @ ###-####. Phone #: ###-#### Inspection requested via web by Joshua Bennett. OK toc cover/final ok.Contractor needs to add the backflow assembly to the permit for a final.
|
Final | 7/20/2018 | 7/20/2018 | 7/20/2018 | P | PART |
Dan Ediger
|
|
|
Certify double check then final. OK to cover
|