Plumbing Rough-in | 9/25/2018 | 9/26/2018 | 9/26/2018 | A | PASS |
Dan Ediger
|
|
|
roof hydrant drain with grade Phone #: ###-#### Inspection requested via web by Raul Castanon shell and core
|
DOC - Permit Finaled | 9/26/2018 | 9/26/2018 | 9/26/2018 | P | PASS |
Dan Ediger
|
|
|
|
Plumbing Rough-in | 9/23/2018 | 9/24/2018 | 9/24/2018 | A | FAIL |
Dan Ediger
|
|
|
roof hose bib drain Phone #: ###-#### Inspection requested via web by Raul Castanon the roof hydraint drain must grade at 1/4/ft
|
Plumbing Rough-in | 9/18/2018 | 9/18/2018 | 9/18/2018 | P | FAIL |
Dan Ediger
|
|
|
drain for roof hydrant, Phone #: ###-#### Inspection requested via web by Raul Castanon Use approved dwv pipe. Min. 1-1/2" and grade to an approved receptor or outside.
|
Roof Drains | 9/13/2018 | 9/14/2018 | 9/14/2018 | A | PART |
Dan Ediger
|
|
|
and water lines Phone #: ###-#### Inspection requested via web by Raul Castanon. roof drains ok. Run an indirect waste from the roof top hydrant to an approved location
|
Water and/or Sewer | 7/24/2018 | 7/25/2018 | 7/25/2018 | A | CANC |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Raul Castanon. passed as a groundwork
|
Groundwork | 7/25/2018 | 7/25/2018 | 7/25/2018 | A | PASS |
Dan Ediger
|
|
|
Phone #: ###-#### Inspection requested via web by Raul Castanon. 4" trunk line and water service stub-out.
|