Final | 4/25/2019 | 4/25/2019 | 4/25/2019 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brandon Rohricht
|
Final | 4/8/2019 | 4/8/2019 | 4/8/2019 | P | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brandon Rohricht-Need to label all non-potable water. Temp final ok.
|
Pressure Test | 1/31/2019 | 1/31/2019 | 1/31/2019 | A | PASS |
Eric Strole
|
|
|
60# pressure test Phone #: ###-#### Inspection requested via web by Brandon Rohricht-60 lb gas test pass.
|
Plumbing Rough-in | 11/13/2018 | 11/13/2018 | 11/13/2018 | P | PART |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brandon Rohricht-Inwall rough-in & piping to interceptor & lift station pass.
|
Groundwork | 8/7/2018 | 8/8/2018 | 8/8/2018 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Brandon Rohricht
|