PLM-Aging Inspection | 6/17/2020 | 6/17/2020 | 6/17/2020 | | PART |
Eric Strole
|
|
|
No calls
|
Plumbing Rough-in | 3/18/2020 | 3/20/2020 | 3/20/2020 | A | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Inspection requested via web by Dru Nakaya
|
PLM-Aging Inspection | 12/20/2019 | 12/20/2019 | 12/20/2019 | | PART |
Eric Strole
|
|
|
No calls
|
PLM-Aging Inspection | 9/20/2019 | 9/20/2019 | 9/20/2019 | | PART |
Eric Strole
|
|
|
No calls
|
PLM-Aging Inspection | 6/21/2019 | 6/21/2019 | 6/21/2019 | | PART |
Eric Strole
|
|
|
wip
|
Pressure Test | 3/22/2019 | 3/22/2019 | 3/22/2019 | P | PASS |
Eric Strole
|
|
|
Underground gas line rough in — no connections, for future use. Phone #: ###-#### Inspection requested via web by Dru Nakaya-20 lb gas test pass
|
Pressure Test | 3/22/2019 | 3/22/2019 | 3/22/2019 | A | FAIL |
Eric Strole
|
|
|
Underground gas line rough in — no connections, for future use. Phone #: ###-#### Inspection requested via web by Dru Nakaya-Need to uncover & test gas line.
|
Other | 3/22/2019 | 3/22/2019 | 3/22/2019 | P | CANC |
Eric Strole
|
|
|
Underground gas line rough in — no connections, for future use. Phone #: ###-#### Inspection requested via web by Dru Nakaya
|
Groundwork | 9/5/2018 | 9/5/2018 | 9/5/2018 | P | PASS |
Eric Strole
|
|
|
I won''t be home, call if you have questions. It''s set up for air test on the water line and sewer rough. thank you! Phone #: ###-#### Inspection requested via web by Dru Nakaya
|
Plumbing Rough-in | 9/5/2018 | 9/5/2018 | 9/5/2018 | P | CANC |
Eric Strole
|
|
|
I won''t be home, call if you have questions. It''s set up for air test on the water line and sewer rough. thank you! Phone #: ###-#### Inspection requested via web by Dru Nakaya
|
Water and/or Sewer | 8/21/2018 | 8/21/2018 | 8/21/2018 | P | PASS |
Eric Strole
|
|
|
Underground water line and sewer. If possible, please call 15 minutes ahead, so I can meet you at the house--I''d like to be there if possible. Phone #: ###-#### Inspection requested via web by Dru Nakaya-Water & sewer pass.
|