Final | 8/7/2019 | 8/8/2019 | 8/8/2019 | P | PASS |
Matt Wrobel
|
|
|
Call half hour before to meet // Juan Phone #: ###-####
|
Final | 8/1/2019 | 8/1/2019 | 8/1/2019 | P | PART |
Matt Wrobel
|
|
|
Juan Phone #: ###-#### change double checks to rps for geothermal and have certified
|
PLM-Aging Inspection | 5/20/2019 | 5/20/2019 | 5/20/2019 | | PART |
Matt Wrobel
|
|
|
wip
|
Plumbing Rough-in | 11/5/2018 | 11/5/2018 | 11/5/2018 | P | PASS |
Dan Ediger
|
|
|
Jaun Phone #: ###-####
|
Final | 11/1/2018 | 11/2/2018 | 11/2/2018 | P | NR |
Dan Ediger
|
|
|
Juan Phone #: ###-####
|
Plumbing Rough-in | 10/30/2018 | 10/31/2018 | 10/31/2018 | P | FAIL |
Dan Ediger
|
|
|
Juan Phone #: ###-#### cleanouts require 24" clearan drain back graded- water lines in garage need raised into conditioned space- shower head lines in ceiling need insulated and tented- pex lines supported per ispc- water softner rough required- missing nailplatesce not behind toilet bowl- water line leak upstairs shower- humidifie
|
Groundwork | 9/24/2018 | 9/25/2018 | 9/25/2018 | A | PASS |
Daryl Spivey
|
|
|
Juan Phone #: ###-####
|